Starting a task

Version 1, draft. Tried on 1 case (in progress).

How to get from "this is mine to do" to the first minute of doing it. For a person starting their own task, and for an agent or teammate helping them start.

When to use it

A task is chosen and nothing blocks it, yet it hasn't begun. Choosing which task comes first is a different SOP. If the task turns out to be blocked, say what it waits on and stop here.

Read the state first

Starting looks different depending on where attention is. Name the state before suggesting anything. The person's own word for it wins over any guess.

State What it looks like What helps the start
Drawn The task is interesting or new. Get out of the way. Do step 3 and go.
Reluctant The task is dull, fiddly or unpleasant, or it means switching place or frame of mind. Shrink the first step and borrow structure (step 4).
Out of reach The task needs a place or a tool you aren't at. Tag it with the place and let it wait there (see Queue by place). Wanting to start and not being able to is not a failed start.
Deep elsewhere Absorbed in something else. Don't interrupt. Park the task with its first step written down.
Returning Coming back after a break or an interruption. Restate where things stand in one line, then step 3.
Resting Not working, by choice. Nothing. Rest is not a state to fix.

Steps

  1. Say what done looks like, in one line. "Three checks run and their results written down." A task with no visible end is hard to begin.
  2. Check the place, then gather what the first step needs. Where do you have to be: anywhere, at a desk, in a particular room? Then devices, logins, files. A missing place or tool is the most common silent blocker. If you aren't there, the task is Out of reach, not late.
  3. Name the first physical action. Small enough to finish in about two minutes and concrete enough to picture: "open the app and load two tracks", not "test the feature". Concrete framing reduces delay (Some: McCrea et al., 2008).
  4. Tie it to a cue. "When I sit down after lunch, I open the app." An if-then plan with a specific moment makes follow-through more likely (Strong: Gollwitzer & Sheeran, 2006). For a reluctant start, borrow structure as well: tell someone when you will begin, or have a helper hand over one step at a time.
  5. Do only that first action. Then decide freely whether to continue. Stopping after one step counts as a start.
  6. Leave a line when you stop. One sentence on what is done and what the next action is, so the next start is a Returning start.

Queue by place

Sitting down somewhere is itself a cue. When you arrive at a place, begin with the tasks that only that place allows, one at a time, before anything that could be done elsewhere. Keep each of those tasks tagged with its place so the queue is ready on arrival. The trip to the place is where attention is most easily pulled away, so the first item should be visible the moment you sit down.

For helpers and agents

Evidence

Changelog